Nia Adjei

Civil engineering student, graduating in 2027

Projects

Illustration: a timber truss footbridge over a river between green banks

Footbridge for a flood plain

Dissertation: a 24 m timber truss that stays usable when the river rises. Built and load-tested at 1:10 scale.

Visit example.com
All coursework and reportsexample.com

Experience

Summer placement, 2026

Ten weeks with a small structural consultancy: site visits, load checks for two footbridges and drawings in Revit. Looking for a graduate role in bridges or flood defence from July 2027.

Skills

  • AutoCAD
  • Revit
  • Python
  • Site surveys
  • Report writing

Example page. A fictional person, shown as the “Student CV” layout.